Wednesday 21 December 2011

BGC TSX:V Brazilian Gold Rapidly Advancing Sao Jorge

Brazilian Gold Intersects Gold Mineralization in 10 Holes Including 54 m Grading 1.24 g/t Gold at the São Jorge Project, Tapajós Region, Brazil

Release No. 25/11
Vancouver, BC, December 19, 2011

Brazilian Gold Corporation (TSXV: BGC) is pleased to report assay results for an additional 10 holes from the 2011 drill program on the São Jorge project in the Tapajós region of northern Brazil. The drill program (37 holes in 14,418 m) was completed the second week of December. Assay results from the first 13 holes were previously reported on January 18th, June 30th and October 24th 2011; assay results from final 13 holes are pending. Results from this drill program along with historic drill holes (108 holes in 22,446 m) will be used in an updated NI43-101 resource estimate.