Thursday, 19 January 2012

Brazilian Gold Corp BGC.TSX.V Announce Higher Grade Gold Discoveries From Their Latest Sao Jorge Drill Campaign

Brazilian Gold Intersects 1.96 g/t Gold over 40 m at the São Jorge Project, Brazil

Brazilian Gold Corporation (TSXV: BGC, "Brazilian Gold" or the "Company") is pleased to report assay results for an additional 8 holes from the 2011 drill program on the São Jorge project in the Tapajós region of northern Brazil. The drill program (37 holes in 14,418 m) was completed the second week of December; assay results from the first 24 holes were previously reported. An updated NI43-101 resource estimate is currently in progress and will incorporate results from the 2011 drill program along with historic drill holes (108 holes in 22,446 m).

Highlights

* SJD-108-11 intersected 1.03 g/t gold over 84 m that includes a higher grade interval of 1.96 g/t gold over 40 m,
* SJD-112-11 intersected 1.52 g/t gold over 14 m, and
* SJD-114-11 intersected 1.37 g/t gold over 14 m (See table below for a complete set of drill intersections).
* Results to date indicate the deposit is open down dip and along strike to the northwest and southeast.
* A resistivity high has been identified along strike of the Sao Jorge deposit to the southeast for 1.5 km
that is in part coincident with a chargeability high. This response is similar to the signature observed
over the known deposit suggesting potential to identify additional zones of gold mineralization to the southeast.

Table 1: Drill results from the Sao Jorge deposit.
----------------------------------------------------------------------
Hole ID Location Section From(m) To(m)&n bsp; Interval(m)* Au g/t
----------------------------------------------------------------------
SJD-106-11 SJ East 7950E 146.00 155.00 9.00 0.45

SJD-108-11 SJ East 7900E 28.00 44.00 16.00 0.63
SJD-108-11 SJ East 7900E 70.00 154.00 84.00 1.03
includes SJ East 7900E 82.00 122.00 40.00 1.96
includes 82.00 90.00 8.00 3.90
includes 102.00 122.00 20.00 2.20
SJD-108-11 SJ East 7900E 196.00 200.00 4.00 0.97

SJD-109-11 SJ West 7000E 89.00 101.00 12.00 0.73
includes SJ West 7000E 95.00 101.00 6.00 1.19
SJD-109-11 SJ West ; 7000E 165.00 175.00 10.00 0.83
SJD-109-11 SJ West 7000E 248.00 270.00 22.00 0.60
SJD-109-11 SJ West 7000E 294.00 306.00 12.00 0.42

SJD-110-11 SJ Central 7600E 226.00 234.00 8.00 0.42
SJD-110-11 SJ Central 7600E 261.00 296.00 35.00 0.27
includes SJ Central 7600E 280.00 290.00 10.00 0.60
SJD-110-11 SJ Central 7600E 421.00 429.00 8.00 0.56

SJD-111-11 SJ East 7900E 44.00 77.00 33.00 0.51
includes SJ East 7900E 50.00 62.00 12.00 1.11
SJD-111-11 SJ East 7900E 141.00 145.00 4.00 2.08
SJD-111-11 SJ East 7900E 173.00 189.00 16.00 0.43
SJD-112-11 SJ West 7050E 202.00 212.00 ; 10.00 0.47
SJD-112-11 SJ West 7050E 258.00 272.00 14.00 1.52

SJD-113-11 SJ West 6900E 316.00 330.00 14.00 0.506

SJD-114-11 SJ West 6750E 88.00 170.00 82.00 0.50
includes SJ West 6750E 88.00 102.00 14.00 1.37
SJD-114-11 SJ West 6750E 411.00 423.00 12.00 1.28
-------------------------- -----------------------------------------
*True thickness is approximately 50% of drill interval.

Ian Stalker, CEO of Brazilian Gold, commented "The Company is delighted to note the higher grade intercepts in these latest drill holes that will add 'quality' ounces to our 'new' resource inventory. We anticipate receiving the assay results from the final 5 holes of the 2011 program by the end of January. The drilling (14,418 m in 37 holes) completed in 2011 along with the historic holes (108 holes in 22,446 m) will be used to complete an updated NI43-101 compliant resource for our São Jorge project early in 2012.

We intend to mine our São Jorge deposit by a traditional open pit approach with indications from our Preliminary Economic Assessment (PEA) of a stripping ratio of approximately 4 to 1 waste to ore.

It is positive to note that the deposit as currently known is open along strike and at depth, but equally impor tant is the new geophysical targets identified along strike of São Jorge to the southeast. These targets are currently being refined and will be drill tested throughout the year. The target has a similar footprint of the existing deposit, i.e. 1.4 km in potential strike length."

The São Jorge project is well situated with respect to infrastructure. It is located approximately 70 km north of the town of Novo Progresso on Highway BR163 that connects the city of Cuiaba in Mato Grosso state with the port city of Santarem on the Amazon River. The highway is currently being asphalted with approximately 30 km remaining to be completed between São Jorge and Novo Progresso. As well as having tarred road access, the project is connected to the electric power grid and a skilled work force is available in Novo Progresso, which has a population of approximately 60,000 people.

The São Jorge deposit is 1,300 m long by up to 200 m wide and has been intersected in drill holes to 350 m depth; the deposit strikes northwest and has a sub-vertical dip. Alteration and mineralization appears to be spatially associated with a number of discontinuous shear and fracture zones within granitic host rocks. Alteration minerals include chlorite, epidote, sericite, silica and sulphides that occur as disseminations, fracture controlled or pervasive alteration. The predominant sulphide is pyrite with minor amounts of chalcopyrite. Gold mineralization is commonly associated with silica+sericite+sulphide alteration and higher gold values are generally associated with higher pyrite content and the presence of chalcopyrite.

Drill holes reported in this news release are angle holes that have been drilled on north-south sections spaced 50 m apart. The drill holes were infill holes that targeted the eastern, central and western part of the deposit up to 300 m below surface. All drill holes in this news release inte rsected significant intervals of alteration and/or gold mineralization.

Results from the 2011 drill program (37 holes in 14,418 m) along with the historic drilling (108 holes in 22,446 m) will be used in a new resource estimate scheduled for completion by the end of the first quarter of 2012. The objective of this program is to identify additional resources that are amenable to open pit extraction thereby increasing the potential mine life and production rate as documented in the recently completed independent NI43-101 Preliminary Economic Assessment (PEA) on the São Jorge deposit (Coffey Mining, June 21st, 2011). The PEA indicates robust economics with an internal rate of return (IRR) of 22.9% and a net present value (NPV) at a 5% discount rate of $99.1 million using a gold price of US$1,300 per ounce. The PEA is based on an mineral resource estimate containing an indicated mineral resource of 11.365 Mt grading 1.0 g/t gold (379,000 ounces of gold) and an inferred mineral resource of 20.673 Mt grading 0.8 g/t gold (558,000 ounces of gold) at a 0.3 g/t gold cut-off. Due to wide spaced drilling in certain parts of the deposit, approximately 50% of this resource was not included in the mine plan. In addition, none of the down dip or infill drilling completed by Brazilian Gold in the 2011 drill program was incorporated in the resource estimate.

Brazilian Gold is currently reviewing the results of its extensive exploration program (drilling, soil geochemistry and IP) completed in 2011. Resistivity and chargeability anomalies, some of which are similar in orientation and amplitude, as those observed over the São Jorge deposit have been outlined in a recently completed 120-line kilometre survey. Gold in soil anomalies are coincident with many of the IP anomalies. Targets identified from this work are currently being evaluated and prioritized for drill testing early in 2012.

Laboratory Procedures< /strong>

Drill core is sampled at 3 metre or smaller intervals using a diamond saw. One half of the sample is archived and the other half is dispatched to Acme Analytical Laboratories Ltd.'s sample preparation facility in Itaituba, Brazil, where the sample is crushed, split and pulverized to -200 mesh. The pulp is shipped to Santiago, Chile or Vancouver, Canada for gold fire assay. Acme Analytical Laboratories Ltd. is an internationally certified ISO 9001 laboratory.

Garnet Dawson, M.Sc., P.Geo. (British Columbia), Vice President, Exploration for the Company and a Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical disclosure contained in this News Release.

About Brazilian Gold Corporation

Brazilian Gold is a Canadian-based public company with a focus on the acquisition, exploration and development of mineral properties in northern Brazil. The Company has title to on e of the largest land packages (3,750 km2) in the Tapajós and adjacent Alta Floresta gold provinces. The land package contains green fields to more advance stage projects including the Company's flagship São Jorge project.

The São Jorge project contains an indicated mineral resource of 11.365 Mt grading 1.0 g/t gold (379,000 ounces of gold) and an inferred mineral resource of 20.673 Mt grading 0.8 g/t gold (558,000 ounces of gold) at a 0.3 g/t gold cut-off (Coffey Mining, June 21, 2011).


Tuesday, 17 January 2012

BGC:TSX.V Brazilian Gold Drilling Continues at Sao Jorge

BGC:TSX.V Brazilian Gold Drilling Corporation, the leading developer of large scale road accessible gold projects in the highly prospective Tapajós region of northern Brazil, reminds the market of the ongoing drill campaign currently underway at its flagship São Jorge project. 


The company has been releasing a steady stream of drill results that have shown increasing grades down dip and along strike. Further results are expected to be released this quarter (2012). 


Coffey Mining an independent mining consultancy company has issued a positive PEA assessment on São Jorge,where Brazilian Gold is rapidly advancing the development


Shares advanced 10% Tuesday as gold advances close to 1,700$oz. Significant government purchases of   gold traded ETF's are helping drive the gold price upwards.


Please visit www.braziliangold.ca for further details.

Thursday, 12 January 2012

Brazilian Gold Corp BGC:TSXV low cost large scale open pit Sao Jorge Gold Project well positioned to weather gold price slump

Brazilian Gold Corp BGC:TSXV the fast track developer of the low cost open pit Sao Jorge Gold Project in northern Brazil reminds investors during a recent roadshow held in London, about the strong possibility the gold price may come off as the US economy improves and the US Dollar strengthens. Brazillian Gold's flagship Sao Jorge project will be a low cost large scale open pit operation
where cash production costs are expected to sit between 400 to 600 dollars per ounce. The company is well positioned to weather a downward pressure , gold price market.

Wednesday, 11 January 2012

TAIA Lion Resources "Sierra Leone The Place For Growth in 2012"

TAIA Lion Resources, one of Sierra Leone's leading natural resources development companies, points investors to the recent positive International Monetary Fund (IMF) report on Sierra Leone.

See below the following Extracts


Extractive industries are expected to drive economic activity. Assuming full 
implementation of two new iron ore mining projects, economic activity and tax revenue will 
increase substantially in the coming years. (Box 1 ) A one-time expansion of real GDP of 
about 45 percent is projected for 2012, while exports could increase by a factor of four. To 
level the playing field for new mining investment and increase revenue, the fiscal regime as 
defined by the Mines and Minerals Act (MMA) of 2009 will be fully applied to future 
agreements. The government intends to implement a resource rent tax (structural benchmark 
for December 2012) to benefit from upside profitability, and a capital gains tax to safeguard 
government revenue in case of sales of lucrative lease agreements in mining and oil 
extraction to third parties.  

Activity in other sectors is also expanding. Real non-iron ore GDP growth is 
expected to increase to 6 percent in 2012 and beyond. Key steps are being taken to strengthen 
the business environment: investment in agriculture and food security, basic infrastructure, 
electricity generation, and health and education. 

URU Metals Positive on Niger Outlook for 2012

URU Metals URU:LSE the london listed uranium exploration company with one of the largest sets of uranium exploration concessions in Niger points investors to the recent International Monetary Fund report on the country where investment in Niger in 2012 will help deliver significant economic gains.With new mines coming online, Niger is set to become the world’s second-biggest uranium producer by 2014. Thanks to those projects as well as a new oil rig, Niger’s economy will grow by more than 14 percent this year.


Oil, Uranium Projects Brighten Medium-term Prospects in Niger
By Clara Mira
IMF African Department
December 19, 2011
Higher natural resource revenues to improve fiscal, external position

Resources earnings should be leveraged into faster growth and poverty reduction

Negotiations with IMF on new program expected to start soon

A new crude oil processing project and rising uranium production are set to boost Niger’s economic growth from next year, the IMF said in its regular review of the West African nation’s economy.

Higher natural resources revenues should also help improve Niger’s fiscal and external position in the medium term.
An integrated oil project that includes extraction and refining of 20,000 barrels per day of crude oil is due to start operations in 2012. A new uranium mine that will make Niger the world’s second-largest uranium producer is scheduled to start production by 2014.
IMF Managing Director Christine Lagarde arrived in Niger during her December 18-22 trip to Africa. Her itinerary included a meeting with President Mahamadou Issoufou and taking part in a cabinet meeting focused on “The Challenges of Economic Development in Niger”. She addressed the National Assembly, and met with representatives of various financial institutions and the private sector.
Mining exports
Niger’s oil and mining exports are projected to show triple growth between 2011 and 2016, boosting government revenue from natural resources. These large projects are expected to improve Niger’s fiscal and external position in the medium term, creating favorable conditions for growth and poverty reduction. Niger’s GDP growth is forecast to soar to 14.1 percent in 2012 from a projected 3.8 percent in 2011.
Niger’s main priority in the period ahead is to leverage the expected scaling up of oil and mining production to accelerate growth and poverty reduction. The IMF review said Niger’s new government has adopted an ambitious development strategy, based on the use of oil and mining revenue to finance public investment in infrastructure, agriculture, health, and education.
IMF missions visiting Niger urged careful management of natural resources, medium-term planning of the public investment program, continued fiscal reform to enhance domestic revenue collection and improve the efficiency of expenditure, and measures to improve the business climate.
Libya crisis effects
Despite its natural resource endowment, Niger remains a low-income country. Its economy remains highly dependent on rain-fed agriculture and vulnerable to external shocks. The country relies substantially on external assistance.
A democratically elected government took office in April 2011, and Niger’s relations with international donors normalized. The crisis in Libya triggered the return of tens of thousands of Nigerien workers, leading to a decline in Niger’s remittances from abroad.
Budget implementation remained on course through August 2011, with revenue exceeding targets and expenditure in line with projections. The 2012 budget is expected to maintain a sound fiscal position while substantially increasing public investment. The impact of rising global food prices on inflation has remained modest thus far.
Niger’s three-year program with the IMF, supported by the Extended Credit Facility, expired in June 2011. Program implementation had been on track initially, but was interrupted by a military coup in February 2010.
Following the recognition of the transitional government in September 2010, the IMF resumed normal engagement with the authorities; but efforts to complete further reviews under the arrangement were constrained by the complex political situation. The new authorities have expressed their interest in negotiating a follow-up program as soon as possible. Negotiations on a new program are expected to start shortly.
Fuel subsidy costs
In 2010, the cost for Niger of subsidizing fuel reached about 1 percent of GDP. These subsidies were not only costly but ill targeted, since they did not benefit the poorest segments of the population. Since June 2011, the government adopted a strategy to gradually eliminate the subsidies, while adopting mitigating measures to protect the urban poor from increases in transportation costs.
The authorities have recently decided to pass part of the benefits of the new oil production to domestic consumers in the form of lower prices at the pump. The extent of the subsidies is, however, limited: the agreed prices are expected to be about 14 to 17 percent below import prices.
Natural resource management
Enhancing transparency in the management of natural resources has been the focus of interest for the authorities and society. As a result, Niger’s 2010 constitution requires the publication of all contracts for the exploration and exploitation of natural resources. Niger is actively engaged in the Extractive Industries Transparency Initiative and was declared in compliance with the standards of the initiative in March 2011.
The state is directly involved as co-shareholder in the main mining and oil projects. This direct exposure implies risks, as the authorities relied on external financing to contribute their share of investment costs in recent projects, in some cases contracting expensive loans and increasing public debt. A debt sustainability analysis concluded that this new borrowing contributed to a rise in Niger’s risks of debt distress from low to moderate.
Natural resource revenues are expected to increase available resources but also expose the country to commodity price volatility. In the medium term, Niger would benefit from adopting a fiscal strategy to confront adverse shocks and stabilize expenditure.

Friday, 6 January 2012

URU:LSE URU Metals Drilling Campaign Advances at Irhazer in Niger

URU Metals LSE:URU, the London listed uranium exploration company is today advancing its drilling campaign at its highly prospective Irhazer permit in Niger. The programme is targeting 3,200 metres, with the main object being to verify the extension of the mineralized zone discovered in previous campaigns and to assess its importance. Previous drilling confirmed the presence of a northern extension of mineralisation of uranium at Irhazer and the continued programme is targeting the down lifted compartment. The company is expected to publish results in Q2 2012 latest.

Brazilian Gold Corp BGC:TSX.V Positive Analyst Coverage


BRAZILIAN GOLD CORP BGC : TSXV  SHARES ADVANCING 

FOLLOWING ENCOURAGING ASSAY RESULTS FROM FLAGSHIP SAO JORGE
By Sara Patterson
Executive Vice President, Windward Global
With January 2012 off to a strong start—at the time of this commentary gold is over US $1,600 and the major indices are firmly in the green—a bullish tone seems to be set for the new year, carrying the upward trend of 2011’s natural resource sector forward. While this tone undoubtedly creates opportunity for active exploration and development companies, an established and sustained momentum is not only preferable but critical. And such momentum was gained or lost long before the ball dropped.
Brazilian Gold Corporation, however, has kept the ball rolling. Its momentum began in early 2011 with the commencement of a drill program at its Sao Jorge project in the Tapajos region of northern Brazil, and carried strongly into late December with the announcement of 10 additional drill holes. Significant intersections include 54 meters grading 1.24 g/t gold; please see the company’s news release dated Dec. 19 2011 for a complete list of assay results. The drill program continues to intersect wide zones of alteration and gold mineralization down dip and along strike of historic drilling, underscoring the project’s potential for ongoing growth and expansion. Further, an induced polarization resistivity high is identified along strike of the deposit to the southeast for 1.5 km, suggesting that additional gold mineralization might be identified in the future.
This encouraging program has critical implications for the project as a whole, as it will be used along with historic drill data in the completion of a new resource estimate by the end of the first quarter of 2012. The ongoing drill results continue to confirm additional intersections at similar thickness and grade as the previously reported resource (Coffey Mining, June 2011), fitting well with the company’s objective of increasing overall potential mine life and production rate with additional resources. In addition to drilling, Brazilian Gold has also initiated metallurgical testwork, geotechnical studies and environmental baseline work to advance Sao Jorge further.
Data compiled at Sao Jorge during 2011 has both contributed to a greater understanding of the deposit’s geology and lent itself to use in upgrading the confidence level and potential size of the next resource estimate. 
Coupled with excellent existing infrastructure, including access to paved roads, a skilled workforce, and access to extremely economical power—Sao Jorge can utilize the low-cost hydroelectric energy grid, as opposed to costly diesel-generated power—this comprehensive level of work continues to build the momentum of the project. Key tax incentives in Sao Jorge’s Pará state, including an income tax reduction of nearly 15% for 10 years, underscore the inherent opportunity of the region.
Assay results from the final 13 holes of the 2011 drill program are pending, and Brazilian Gold is currently reviewing the results of the full 2011 program. Targets identified from soil and IP anomalies will be evaluated and prioritized for early 2012 drill testing, carrying Sao Jorge’s progress definitively forward into the new year.
The following is from a press release issued by Brazilian Gold Corporation on Dec. 19, 2011.
Brazilian Gold Corporation (TSXV: BGC) is pleased to report assay results for an additional 10 holes from the 2011 drill program on the São Jorge project in the Tapajós region of northern Brazil. The drill program (37 holes in 14,418 m) was completed the second week of December. Assay results from the first 13 holes were previously reported on January 18th, June 30th and October 24th 2011; assay results from final 13 holes are pending. Results from this drill program along with historic drill holes (108 holes in 22,446 m) will be used in an updated NI43-101 resource estimate.
Highlights
Significant gold intersections include: 
SJD-096-11: 1.77 g/t over 4 m (42 to 46 m) and 4.37 g/t over 4 m (106 to 110 m), 
SJD-097-11: 1.24 g/t over 54 m (187 to 241 m), 
SJD-101-11: 1.79 g/t over 16 m (38 to 54 m) and 1.84 g/t over 8 m (74 to 82 m), 
SJD-102-11: 1.21 g/t over 14 m (130 to 144 m), and 
SJD-103-11: 2.28 g/t over 11 m (130 to 144 m)
 Drill program continues to intersect wide zones of alteration and gold mineralization down dip and along strike of historic drilling. 
An induced polarization (IP) resistivity high with or without a coincident chargeability high is identified along strike of the São Jorge
deposit to the southeast for 1.5 km suggesting potential to identify additional gold mineralization.
The São Jorge project is well situated with respect to infrastructure. It is located approximately 70 km north of the town of Novo Progresso on Highway BR163 that connects the city of Cuiaba in Mato Grosso state with the port city of Santarem on the Amazon River. The highway is currently being asphalted with approximately 30 km remaining to be completed between São Jorge and Novo Progresso. As well as having tarred road access, the project is connected to the electric power grid and a skilled work force is available in Novo Progresso, which has a population of approximately 60,000 people.
The São Jorge deposit is 1,300 m long by up to 200 m wide and has been intersected in drill holes to 350 m depth; the deposit strikes northwest and has a sub-vertical dip. Alteration and mineralization appears to be spatially associated with a number of discontinuous shear and fracture zones within granitic host rocks. Alteration minerals include chlorite, epidote, sericite, silica and sulphides that occur as disseminations, fracture controlled or pervasive alteration. The predominant sulphide is pyrite with minor amounts of chalcopyrite. Gold mineralization is commonly associated with silica+sericite+sulphide alteration and higher gold values are generally associated with higher pyrite content and the presence of chalcopyrite.
Drill holes reported in this news release are angle holes that have been drilled on north-south sections spaced 50 m apart. The drill holes were infill holes that targeted the eastern part of the deposit up to 250 m below surface. All drill holes in this news release except for drill hole SJD-098b-11 and SJD-105-11 intersected significant intervals of alteration and gold mineralization.
Brazilian Gold is currently reviewing the results of its extensive exploration program (drilling, soil geochemistry and IP) completed in 2011. Resistivity and chargeability anomalies, some of which are similar in orientation and amplitude, as those observed over the São Jorge deposit have been outlined in a recently completed 120-line kilometre survey. Gold in soil anomalies are coincident with many of the IP anomalies. Targets identified from this work are currently being evaluated and prioritized for drill testing early in 2012.
Disclaimer:
The Resource Stock Watch is wholly owned by The Windward Agency, Corp., a public relations and investor relations firm based in the United States of America. The Windward Agency collects a monthly consulting fee from the featured firm and this document is presented solely as a baseline research vehicle. It is not an offer to buy nor sell the featured security. This publication does not make buy or sell recommendations as a matter of established policy. Further, no investment decision should be made without first consulting with a registered investment advisor. The data herein is compiled using data furnished by the featured firm as well as from third-party research and commentary sources.